The charging process starts as soon as the
the charger is connected to the electric vehicle. The function
The delayed start function allows you to set the start time
in 2-hour increments (2/4/6/8 hours). This
function allows the vehicle to be charged using
photovoltaic current or tariffs outside of periods
maximum load. LEDs indicate the current
charge status. Additional LED
indicators to the right and left of the top
of the housing allow the current operating status to be viewed even from afar.
at a distance.
